 Blacklick RidgeFranklin County, Ohio
Project Type: Luxury Home Development
Customer: M/I Homes
Span Length: 140'
Structural Details: Prestressed Concrete Bulb-Tee Girders with a poured-in-place composite concrete deck.
Project Details: After many months of frustrating attempts to satisfy FEMA requirements, M/I Homes chose our system to solve their bridge problem and provide a scenic entrance to their development project. By crossing the entire stream and embankment with a single span, we eliminated costly construction in the water while providing a tasteful custom engineered solution.
After an analysis of the site conditions, 140' modified concrete bulb-tee girders were selected to complete the span. On time and on budget, we delivered a fully engineered, maintenance free stream crossing, at the lowest cost possible.
|